Douglas County Jail Installation
The system was to be installed to augment two boilers in the basement mechanical room at the jail. These boilers supplied only part of the buildings hot water supply. Five Solene Aurora 4’x10’ collectors were to be connected to a SHEM 120DB... Read on»

Wakrusa Elementary Installation
The school is immediately south of Lawrence, KS. serves approx. 200 students. Working in combination with Tom Braccio, Director of Facilities for the Lawrence School District, the project was introduced, put to bid, contracted for, constructed and paid for within 90 days... Read on»

Youth Services Building Installation
The system was to be installed to augment two boilers in the mechanical room found in the attic of the building. These boilers supplied all of the buildings hot water supply. Three Solene Aurora 4’x10’ collectors were to be connected to a SHEM 120DB... Read on»

Lakewood Assisted Living Installation
This assisted living facility boiler system in Redding, CA. consists of a Locinvar 400,000 btu per hour gas boiler connected to a 120 gallon storage tank via a recirculation system. This configuration draws... Read on»

|